NW 22nd Avenue over Biscayne Canal C-8

0.2 Mile N of NW 151 St · County 086, Florida · Built 1964 · 4 Lanes · 17,200 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
874030
Year Built
1964
Length
34.1 m (111.9 ft)
Max Span
11.4 m
Width
25.3 m (83 ft)
Lanes
4
Daily Traffic
17,200
Material
Prestressed Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.