Central Blvd. WB over MIA West Service Road
Miami Intl Airport · County 086, Florida · Built 2013 · 4 Lanes · 36,488 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
25.794875, -80.270931
This bridge is in worse condition than 3.7% of bridges in County 086. The average bridge in Florida is 0 years old; this one is 13 years old.
Nearby Bridges
Central Blvd EB over West Service Road
Built 2012
Ramps S1 and SC EB over West Service Road
Built 2012
Central Blvd. WB over MIA Utl Corridor
Built 2013
Central Blvd EB over MIA Utility Corr.
Built 2012
Ramp S1 Eastbound over MIA Utility Corr.
Built 2012
WB NW 21st Street over RR and McLaughlin Dr.
Built 1971
EB NW 21st St. over RR and McLaughlin Dr.
Built 1971
NW 42nd Court over Tamiami Canal C-4
Built 2013
Perimeter Road over Drainage Canal
Built 1960
MIA Off Ramp 4 over MIA Interchange
Built 2008
Bridge Details
- Structure #
- 874010
- Year Built
- 2013
- Length
- 49.3 m (161.7 ft)
- Max Span
- 49.3 m
- Width
- 22.6 m (74.1 ft)
- Lanes
- 4
- Daily Traffic
- 36,488
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.