SR-836 over NW 82ND AVE
SR 826 / SR-826 INTERCHAN · County 086, Florida · Built 2011 · 3 Lanes · 35,500 vehicles/day
Overall
Deck
8
Very Good
Superstructure
9
Excellent
Substructure
9
Excellent
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 9 | Excellent |
| Substructure | 9 | Excellent |
Location
25.782167, -80.328389
This bridge is in worse condition than 3.7% of bridges in County 086. The average bridge in Florida is 0 years old; this one is 15 years old.
Nearby Bridges
SR 836 WEST Bound over NW 82 Avenue
Built 2012
WB SR 836 over NW 82 Ave.
Built 2013
EB SR 836 over NW 82nd AVE
Built 2014
SR-836 EB ON RAMP over NW 82nd Avenue
Built 2011
EB SR-836 OFF RAMP over NW 82nd Avenue
Built 2011
WB SR-836 On Ramp over NW 12th St.
Built 2019
SR 826 SB Off-RAMP over WB 836 Off - Ramp CD
Built 2013
SB SR 826 Off-ramp over NW 12 Street
Built 2013
SB SR 826 over NW 12th Street
Built 2015
SB SR 826 RAMP S-W over CSX RR
Built 2013
Bridge Details
- Structure #
- 871083
- Year Built
- 2011
- Length
- 60 m (196.9 ft)
- Max Span
- 35.3 m
- Width
- 17.4 m (57.1 ft)
- Lanes
- 3
- Daily Traffic
- 35,500
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Toll Authority
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.