WB SR 836 Off-ramp over SR 969 (NW 72nd Ave.)
SR 826 / SR 836 Interchan · County 086, Florida · Built 2015 · 3 Lanes · 10,400 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 8 | Very Good |
Location
25.780197, -80.315317
This bridge is in worse condition than 18.4% of bridges in County 086. The average bridge in Florida is 0 years old; this one is 11 years old.
Nearby Bridges
WB SR 836 over SR 969 (NW 72nd Ave)
Built 2014
WB SR 836 over WB SR 836 & NW 72nd Ave
Built 2015
EB SR 836 over EB SR 836 & NW 72nd Ave
Built 2015
EB SR 836 over SR 969 / Milam Dairy Rd
Built 2014
Ramp NF-EBCD over SR 969 (NW 72 Ave.)
Built 2013
Ramp NF - LE over over EB COLLECTOR DISTRIBUTOR
Built 2013
Ramp N-E / Ramp EB over EB Collector Distrbutor
Built 2013
WB SR 836 Off-ramp over WB SR 836 to NB SR 826
Built 2013
Ramp over Ramp
Built 2013
EBCD Over SR 826 over SR 826
Built 2013
Bridge Details
- Structure #
- 871076
- Year Built
- 2015
- Length
- 79.9 m (262.1 ft)
- Max Span
- 42.2 m
- Width
- 18 m (59.1 ft)
- Lanes
- 3
- Daily Traffic
- 10,400
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Toll Authority
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.