RAMP B-3 MM 27.2 over HEFT/SR836/NW 12 ST/RR
SR 836/HEFT Interchange · County 086, Florida · Built 2023 · 1 Lanes
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
25.781208, -80.385875
This bridge is in worse condition than 3.7% of bridges in County 086. The average bridge in Florida is 0 years old; this one is 3 years old.
Nearby Bridges
Ramp A-2A MM 27.2 over HEFT/SR836/NW 12 St/RR
Built 2023
SR821 NBHEFT 26.99 over SR836 NW 12ST CANAL RR
Built 2002
SR821 RAMP SB 27.2 over SR836-NW 12ST-CANAL-RR
Built 2004
SR821 RMP NB 26.99 over SR 836 NW 12ST CANAL RR
Built 2021
SR821 SBHEFT 26.99 over SR 836 NW 12ST CANAL RR
Built 1973
EB SR 836 over SR 836
Built 2024
SR836 Ramp to Tnpk over FL Turnpike
Built 2023
SR821 NB RAMP 27.1 over SNAPPER CREEK CANAL
Built 2021
WB SR 836 Off Ramp over NB/SB H.E.F.T (Turnpike)
Built 2005
WB SR 836 On Rmp over SR 836
Built 2024
Bridge Details
- Structure #
- 870942
- Year Built
- 2023
- Length
- 369.1 m (1211 ft)
- Max Span
- 67.1 m
- Width
- 11 m (36.1 ft)
- Lanes
- 1
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Toll Authority
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.