SR-9 (NW 27 Ave)SB over Miami River

NW 27 Ave & Miami River · County 086, Florida · Built 1997 · 3 Lanes · 17,750 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
870763
Year Built
1997
Length
111.4 m (365.5 ft)
Max Span
50.2 m
Width
17.3 m (56.8 ft)
Lanes
3
Daily Traffic
17,750
Material
Steel
Design
Movable - Bascule
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$650,000
Total Project Cost
$650,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.