S MIAMI AVE - I-95 over SR-970 TO SW 1ST CT

DOWNTOWN INTRCHG · County 086, Florida · Built 1969 · 1 Lanes · 4,200 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
870555
Year Built
1969
Length
274.3 m (899.9 ft)
Max Span
31.7 m
Width
8.6 m (28.2 ft)
Lanes
1
Daily Traffic
4,200
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.