SR836 WB TO I95 SB over I95 & I95 RAMPS &14TH ST

MIDTOWN INTERCHANGE · County 086, Florida · Built 1969 · 1 Lanes · 14,500 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
870371
Year Built
1969
Length
264.3 m (867.1 ft)
Max Span
39 m
Width
7.9 m (25.9 ft)
Lanes
1
Daily Traffic
14,500
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$17,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.