SR836 WB TO I95 SB over I95 & I95 RAMPS &14TH ST
MIDTOWN INTERCHANGE · County 086, Florida · Built 1969 · 1 Lanes · 14,500 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 7 | Good |
Location
25.788736, -80.203589
This bridge is in worse condition than 70% of bridges in County 086. The average bridge in Florida is 0 years old; this one is 57 years old.
Nearby Bridges
SR836EB - I-95NB over I-95 SB & I-395 EB RAMP
Built 1969
NW 14 ST over I-95 SB (SR-9A)
Built 1968
SR 836 EB over SR I-95 Mainline
Built 2023
I-95NB TO SR836WB over NW 14 ST I-395 I-95
Built 1968
I-95 NB TO I-395EB over NW 14 ST
Built 2023
SR-836EB TO I-95SB over NW 14 ST & NW 8TH EXIT
Built 1969
SR 836 WB over NW 3rd Ave
Built 2023
SR-836WB TO I-95NB over NW 17TH ST
Built 1969
SR 836 EB over SR 7/I-95 Main and Ramps
Built 1969
SR 836 WB over SR 7/I-95 Main and Ramps
Built 1968
Bridge Details
- Structure #
- 870371
- Year Built
- 1969
- Length
- 264.3 m (867.1 ft)
- Max Span
- 39 m
- Width
- 7.9 m (25.9 ft)
- Lanes
- 1
- Daily Traffic
- 14,500
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $17,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.