I-95 SB (870429) over NW 62 ST

1MI S OF SR-934 · County 086, Florida · Built 1959 · 6 Lanes · 100,250 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
870308
Year Built
1959
Reconstructed
1993
Length
47.5 m (155.8 ft)
Max Span
23.2 m
Width
26.8 m (87.9 ft)
Lanes
6
Daily Traffic
100,250
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.