SR821 SB HEFT 22.4 over SW 56 ST MILLER DR

0.97 mi. N of SR-986 · County 086, Florida · Built 1973 · 5 Lanes · 71,700 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
870206
Year Built
1973
Reconstructed
2019
Length
62.8 m (206 ft)
Max Span
31.4 m
Width
27.3 m (89.6 ft)
Lanes
5
Daily Traffic
71,700
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Toll Authority
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.