SR821 SB HEFT 18.0 over RELOCATED CANAL C-100

5.3 MILES NORTH OF US-1 · County 086, Florida · Built 1973 · 5 Lanes · 60,950 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
870201
Year Built
1973
Reconstructed
2019
Length
33.9 m (111.2 ft)
Max Span
11.3 m
Width
25.9 m (85 ft)
Lanes
5
Daily Traffic
60,950
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Toll Authority
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.