COMP SR-90 over SPILLWAY 12-D

13.17M E COLLIER & MONROE · County 086, Florida · Built 1962 · 2 Lanes · 5,900 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Condition Ratings

ComponentRatingDescription
Deck 8 Very Good
Superstructure 8 Very Good
Substructure 8 Very Good

Location

30.727206, -85.972642

This bridge is in worse condition than 3.7% of bridges in County 086. The average bridge in Florida is 0 years old; this one is 64 years old.

Nearby Bridges

Bridge Details

Structure #
870031
Year Built
1962
Length
51.3 m (168.3 ft)
Max Span
8.5 m
Width
10.4 m (34.1 ft)
Lanes
2
Daily Traffic
5,900
Material
Prestressed Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.