COMP SR-5 over CORAL GABLES CANAL
W OF SW 42 AVE · County 086, Florida · Built 1942 · 6 Lanes · 79,000 vehicles/day
Overall
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 6 | Satisfactory |
| Substructure | 7 | Good |
Location
25.723092, -80.266417
This bridge is in worse condition than 70% of bridges in County 086. The average bridge in Florida is 0 years old; this one is 84 years old.
Nearby Bridges
Ponce de Leon Blvd over Coral Gables Canal
Built 1970
Blue Rd/SW 48th St over Coral Gables Canal East
Built 1975
Blue Rd (SW 48 St) over Coral Gables Canal West
Built 1962
Pisano Avenue over Coral Gables Waterway
Built 1989
Hardee Rd(64th St) over Coral Gables Canal
Built 1930
COMP SR-976 over CORAL GABLES CANAL
Built 1951
Granada Blvd. over Coral Gables Canal
Built 1930
GRANADA BLVD over CORAL GABLES CANAL
Built 1960
Maynada Street over Mahi Canal
Built 1950
SW 42nd Avenue over Coral Gables Canal
Built 1943
Bridge Details
- Structure #
- 870019
- Year Built
- 1942
- Reconstructed
- 1957
- Length
- 27.6 m (90.6 ft)
- Max Span
- 16.7 m
- Width
- 28.7 m (94.2 ft)
- Lanes
- 6
- Daily Traffic
- 79,000
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $147,000
- Total Project Cost
- $147,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.