SR-5 SB over PRINCETON CANAL C-102
0.3M N OF SW 244 ST · County 086, Florida · Built 1966 · 2 Lanes · 18,000 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
25.536481, -80.410836
This bridge is in worse condition than 18.4% of bridges in County 086. The average bridge in Florida is 0 years old; this one is 60 years old.
Nearby Bridges
SR-5 NB (870229) over PRINCETON CANAL C-102
Built 1965
Busway Extension over Canal C-102
Built 2005
SW 248th Street over Canal C-102
Built 1966
SW 256th Street over Canal C-102
Built 1966
SW 232nd Street over Canal C-102
Built 1966
SR821 SB HEFT 7.52 over CANAL C-102
Built 1973
SR821 NB HEFT 7.55 over CANAL C-102
Built 1973
SW 137th Ave over C-102 Canal
Built 2021
SW 125th Avenue over Canal C-102
Built 1975
SR821 SB HEFT 6.76 over SW 268 ST
Built 1973
Bridge Details
- Structure #
- 870011
- Year Built
- 1966
- Reconstructed
- 2002
- Length
- 21 m (68.9 ft)
- Max Span
- 7 m
- Width
- 15.2 m (49.9 ft)
- Lanes
- 2
- Daily Traffic
- 18,000
- Material
- Concrete
- Design
- Slab
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $77,000
- Total Project Cost
- $77,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.