SE 8th ST over RIO CORDOVA

30FT E of CORDOVA RD · County 011, Florida · Built 1972 · 2 Lanes · 800 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
5
Fair

Bridge Details

Structure #
865761
Year Built
1972
Length
27.1 m (88.9 ft)
Max Span
9.4 m
Width
11 m (36.1 ft)
Lanes
2
Daily Traffic
800
Material
Prestressed Concrete
Design
Slab
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.