EAST LAS OLAS BLVD over HIMMARSHEE CANAL
0.3 MI EAST OF US-1 · County 011, Florida · Built 1930 · 4 Lanes · 20,405 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 6 | Satisfactory |
Location
26.119636, -80.108264
This bridge is in worse condition than 70.1% of bridges in County 011. The average bridge in Florida is 0 years old; this one is 96 years old.
Nearby Bridges
Las Olas Boulevard over Intracoastal Waterway
Built 1958
SE 25th Ave. over Rio Idlewild Canal
Built 1993
SOLAR PLAZA DR. over RIO PLACID CANAL
Built 1971
SE 23RD AVENUE over RIO DEL MAR
Built 1966
Solar Plaza Rd over Rio Canal
Built 1971
NE 26th Terrace over Rio Desota Canal
Built 1969
SE 23RD AVENUE over RIO CASTILLA CANAL
Built 1966
NE 23RD AVENUE over RIO ARAGON CANAL
Built 1968
ROYAL PALM DRIVE over LAS OLAS CANAL
Built 2016
NE 23rd Avenue over Rio Toledo Canal
Built 1969
Bridge Details
- Structure #
- 865729
- Year Built
- 1930
- Reconstructed
- 1950
- Length
- 30.2 m (99.1 ft)
- Max Span
- 10.1 m
- Width
- 18.3 m (60 ft)
- Lanes
- 4
- Daily Traffic
- 20,405
- Material
- Concrete
- Design
- Arch - Deck
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $237,000
- Total Project Cost
- $297,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.