SUNSHINE WAY over COCONUT CREEK WATERWAY

150FT E of LAKE DR. · County 011, Florida · Built 1969 · 2 Lanes · 1,373 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
865003
Year Built
1969
Length
7.9 m (25.9 ft)
Max Span
7.9 m
Width
11.6 m (38.1 ft)
Lanes
2
Daily Traffic
1,373
Material
Prestressed Concrete
Design
Slab
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.