Hiatus Road over Middle River C-13 Canal

.25 Mi. S. of Oakland Pk. · County 011, Florida · Built 2017 · 4 Lanes · 2,000 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
864125
Year Built
2017
Length
32 m (105 ft)
Max Span
11 m
Width
26.4 m (86.6 ft)
Lanes
4
Daily Traffic
2,000
Material
Prestressed Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.