ELLER DRIVE over FPL Discharge Canal

1 Mile East of I-595 · County 011, Florida · Built 1999 · 5 Lanes · 1,001 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
864118
Year Built
1999
Length
42.1 m (138.1 ft)
Max Span
14 m
Width
27.4 m (89.9 ft)
Lanes
5
Daily Traffic
1,001
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.