W BROWARD BLVD over C-2 CANAL

0.1MI W OF PINE ISLAND RD · County 011, Florida · Built 1996 · 6 Lanes · 25,282 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
864109
Year Built
1996
Length
24.2 m (79.4 ft)
Max Span
12.1 m
Width
40.4 m (132.5 ft)
Lanes
6
Daily Traffic
25,282
Material
Prestressed Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.