NW 1 ST over C-10 CANAL
0.1 MI E OF BRYAN RD. · County 011, Florida · Built 1958 · 2 Lanes · 2,992 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 5 | Fair |
Location
26.053833, -80.155053
This bridge is in worse condition than 89.2% of bridges in County 011. The average bridge in Florida is 0 years old; this one is 68 years old.
Nearby Bridges
OLD GRIFFIN RD. over C-10 CANAL
Built 1983
SR-848 Stirling Rd over C-10 Canal
Built 1982
I-95 SB (SR-9) over SR-848 Stirling Rd.
Built 1990
I-95 NB (SR-9) over SR-848 Stirling Rd.
Built 1990
New Griffin Rd. over Dania Cut-Off Canal
Built 1984
US-1 (SR-5) over Dania Cut-Off Canal
Built 1931
I-95 (SR-9) NB over SR-818 (Griffin Rd.)
Built 1989
I-95 (SR-9) SB over SR-818 (Griffin Road)
Built 1990
I-95 (SR-9) over C-10 Spur Canal
Built 1962
N 29TH AVENUE over C-10 SPUR CANAL
Built 1967
Bridge Details
- Structure #
- 864031
- Year Built
- 1958
- Length
- 23.9 m (78.4 ft)
- Max Span
- 8.1 m
- Width
- 12.3 m (40.4 ft)
- Lanes
- 2
- Daily Traffic
- 2,992
- Material
- Prestressed Concrete
- Design
- Slab
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.