Tpk to EBI595/SR84 over I595 Ramp to SR7

I-595 & SR7 Interchange · County 011, Florida · Built 2011 · 1 Lanes · 22,000 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
860657
Year Built
2011
Length
26.4 m (86.6 ft)
Max Span
26.4 m
Width
9.2 m (30.2 ft)
Lanes
1
Daily Traffic
22,000
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.