NOB HILL RD. over N. NEW RIVER CANAL

NOB HILL RD JCT W/SR-84 · County 011, Florida · Built 1988 · 7 Lanes · 29,322 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
860356
Year Built
1988
Reconstructed
2012
Length
46.1 m (151.2 ft)
Max Span
9.2 m
Width
40.2 m (131.9 ft)
Lanes
7
Daily Traffic
29,322
Material
Concrete Continuous
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.