I-75 (SR-93) NB over INDIAN TRACE (184TH AVE)
2.6 MI E of US-27 · County 011, Florida · Built 1983 · 3 Lanes · 27,750 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
26.1355, -80.400467
This bridge is in worse condition than 8.9% of bridges in County 011. The average bridge in Florida is 0 years old; this one is 43 years old.
Nearby Bridges
I-75 (SR-93) SB over INDIAN TRACE (184TH AVE)
Built 1983
I-75 (SR-93) NB over GLADES PKWY (NW 196 AVE)
Built 1980
I-75 (SR-93) SB over GLADES PKWY (NW 196 AVE)
Built 1980
I-75 (SR-93) SB over BONAVENTURE BLVD
Built 1983
I-75 (SR-93) NB over BONAVENTURE BLVD
Built 1983
INDIAN TRACE (WB) over LAKE WESTON
Built 1988
INDIAN TRACE (EB) over LAKE WESTON
Built 1988
WESTON ROAD over N NEW RIVER CANAL(G-15)
Built 1970
I-75 (SR-93) NB over WESTON RD
Built 1986
I-75 (SR-93) SB over WESTON ROAD
Built 1986
Bridge Details
- Structure #
- 860342
- Year Built
- 1983
- Length
- 54.6 m (179.1 ft)
- Max Span
- 31.4 m
- Width
- 17.9 m (58.7 ft)
- Lanes
- 3
- Daily Traffic
- 27,750
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.