NB I-95 (SR-9) over NW 6th St (Sistrunk Blv)

0.50 mi. N of SR-842 · County 011, Florida · Built 1975 · 7 Lanes · 157,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
860273
Year Built
1975
Reconstructed
2023
Length
48.3 m (158.5 ft)
Max Span
25.3 m
Width
34.1 m (111.9 ft)
Lanes
7
Daily Traffic
157,000
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.