SB US-27 (SR-25) over Canal S-11A

2.2 miles north of I-75 · County 011, Florida · Built 1980 · 3 Lanes · 4,450 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
860247
Year Built
1980
Length
35.8 m (117.5 ft)
Max Span
9.1 m
Width
16.6 m (54.5 ft)
Lanes
3
Daily Traffic
4,450
Material
Prestressed Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.