SR-91 TPK 61.328 over Mid-river Canal C-13

0.6 mi. N of SR-816 · County 011, Florida · Built 1956 · 8 Lanes · 142,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
860180
Year Built
1956
Reconstructed
2011
Length
27.8 m (91.2 ft)
Max Span
9.4 m
Width
44.2 m (145 ft)
Lanes
8
Daily Traffic
142,000
Material
Concrete
Design
Slab
Owner
State Toll Authority
Last Inspected
N/A
Est. Improvement
$112,000
Total Project Cost
$112,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.