Flamingo Rd. SB over C-9 (Snake Creek Canal)
1.0 Mi S of Miramar Pkwy · County 011, Florida · Built 1959 · 2 Lanes · 17,600 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
25.964289, -80.310819
This bridge is in worse condition than 8.9% of bridges in County 011. The average bridge in Florida is 0 years old; this one is 67 years old.
Nearby Bridges
Flamingo Rd. NB over C-9 (Snake Creek Canal)
Built 2006
N BASS CREEK ROAD over AT FLAMINGO CANAL
Built 1974
SR821 NB HEFT 42.2 over FLAMINGO RD & CANAL
Built 1973
SR821 SB HEFT 42.1 over FLAMINGO RD & CANAL
Built 1973
FLAMINGO RD/RED RD over C-9 CANAL
Built 1989
SR-823 NW 57th Ave over SR-821 FL Tpk. Ext.
Built 1989
SR821 NB HEFT 40.7 over SNAKE CREEK CANAL
Built 1973
SR821 SB HEFT 40.7 over SNAKE CREEK CANAL
Built 1973
BASS CK MAINT RD over DRAINAGE CANAL
Built 1974
SR 847 over SNAKE CREEK CANAL C-9
Built 2019
Bridge Details
- Structure #
- 860149
- Year Built
- 1959
- Length
- 38.4 m (126 ft)
- Max Span
- 12.8 m
- Width
- 10.4 m (34.1 ft)
- Lanes
- 2
- Daily Traffic
- 17,600
- Material
- Prestressed Concrete
- Design
- Slab
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.