SB I-75 (SR-93) over B25 CANAL

6 MI W of US-27 · County 011, Florida · Built 1967 · 2 Lanes · 16,336 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
860054
Year Built
1967
Reconstructed
1989
Length
36.6 m (120.1 ft)
Max Span
12.2 m
Width
13.1 m (43 ft)
Lanes
2
Daily Traffic
16,336
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.