CR 13 over MCCULLOUGH BRANCH

0.5 MI NW OF CR 305 · County 109, Florida · Built 1979 · 2 Lanes · 2,000 vehicles/day

Overall
Fair
Culvert
5
Fair

Bridge Details

Structure #
784039
Year Built
1979
Length
12.8 m (42 ft)
Max Span
3.3 m
Lanes
2
Daily Traffic
2,000
Material
Concrete
Design
Culvert
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$1,000
Total Project Cost
$3,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.