SR-9B NB over Russell Sampson Rd
SR 9B/Russell Sampson Rd · County 109, Florida · Built 2018 · 3 Lanes · 27,750 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
30.081556, -81.528078
This bridge is in worse condition than 36.9% of bridges in County 109. The average bridge in Florida is 0 years old; this one is 8 years old.
Nearby Bridges
SR 9B SB over Russell Sampson Rd
Built 2018
SR 9B NB over Durbin Creek
Built 2018
SR-9B SB over Durbin Creek
Built 2018
ST JOHNS PKWY over Creek
Built 2021
SR 9B NB over Peyton Parkway
Built 2018
SR 9B SB over Peyton Parkway
Built 2018
West Peyton Pkwy over Drainage Ditch
Built 2018
RACE TRACK RD (EB) over DURBIN CREEK
Built 1999
RACE TRACK RD (WB) over DURBIN CREEK
Built 2018
SR 9B SB over Race Track Rd
Built 2017
Bridge Details
- Structure #
- 780131
- Year Built
- 2018
- Length
- 37.1 m (121.7 ft)
- Max Span
- 37.1 m
- Width
- 16.8 m (55.1 ft)
- Lanes
- 3
- Daily Traffic
- 27,750
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.