I-95 NB (SR-9) over SR-206

I-95 NB OVER SR-206 · County 109, Florida · Built 1965 · 3 Lanes · 35,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
780044
Year Built
1965
Reconstructed
1991
Length
36.3 m (119.1 ft)
Max Span
14.6 m
Width
18 m (59.1 ft)
Lanes
3
Daily Traffic
35,000
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.