Terminal C Access over Retention Pond
.1 Mi W Jeff Fuqua Blvd. · County 095, Florida · Built 2016 · 4 Lanes · 1,001 vehicles/day
Overall
Culvert
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 8 | Very Good |
Location
28.408633, -81.307156
This bridge is in worse condition than 8.7% of bridges in County 095. The average bridge in Florida is 0 years old; this one is 10 years old.
Nearby Bridges
Station Loop Rd. over Retention Pond
Built 2016
2nd Lvl Deplane C over 1st Lvl Deplane C
Built 2021
6th Lvl Enplane C over 2nd Lvl Deplane C
Built 2021
Jeff Fuqua Blvd S over Rail Corridor
Built 2016
Jeff Fuqua Blvd NB over Rail Corridor
Built 2017
South Access Road over OIA S Airport Complex
Built 2014
Terminal C Arrival over Retention Pond
Built 2003
South Access Road over Jeff Fuqua Blvd
Built 2017
Heintzelman Blv SB over Bypass Canal
Built 2003
Heintzelman Blv NB over Bypass Canal
Built 2003
Bridge Details
- Structure #
- 755953
- Year Built
- 2016
- Length
- 10 m (32.8 ft)
- Max Span
- 3 m
- Lanes
- 4
- Daily Traffic
- 1,001
- Material
- Concrete
- Design
- Culvert
- Owner
- Other Local Agencies
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.