CR-545 / Avalon Rd over Bear Bay Swamp

3.7Mi N of SR-530/US-192 · County 095, Florida · Built 1978 · 2 Lanes · 10,400 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
754310
Year Built
1978
Length
10.8 m (35.4 ft)
Max Span
3.7 m
Lanes
2
Daily Traffic
10,400
Material
Concrete
Design
Culvert
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.