Campo Way over LW-9 Drainage Canal

300 Ft. N of Calloway Dr · County 095, Florida · Built 2010 · 2 Lanes · 259 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
754111
Year Built
2010
Length
13.3 m (43.6 ft)
Max Span
3 m
Lanes
2
Daily Traffic
259
Material
Concrete
Design
Culvert
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.