Ramp A2-3B over Pond BC-2 to Pond A-6

SR-528 W of SR-436 · County 095, Florida · Built 2021 · 1 Lanes · 5,700 vehicles/day

Overall
Good
Culvert
8
Very Good

Bridge Details

Structure #
750927
Year Built
2021
Length
6.6 m (21.7 ft)
Max Span
3.3 m
Lanes
1
Daily Traffic
5,700
Material
Concrete
Design
Culvert
Owner
State Toll Authority
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.