SR-453 SB over Orange-Lake Co Line
1.4Mi. South of SR-46 · County 095, Florida · Built 2018 · 3 Lanes · 3,400 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
28.786, -81.573417
This bridge is in worse condition than 8.7% of bridges in County 095. The average bridge in Florida is 0 years old; this one is 8 years old.
Nearby Bridges
SR-453 NB over Orange-Lake Co Line
Built 2018
SR-453 SB over Ondich Rd.
Built 2018
SR-429 SB over Plymouth Sorrento Road
Built 2018
SR 453 NB over Coronado Somerset Dr.
Built 2018
SR 453 SB over Coronado Somerset Dr
Built 2018
SR-429 SB over Ondich Road & Ramp M
Built 2018
SR-429 SB over Plymouth Sorrento Road
Built 2018
SR-429 NB over Plymouth Sorrento Road
Built 2018
SR-429 NB over Ondich Road & Ramp M
Built 2018
SR 429 NB Ramp K over SR-429 NB & SB
Built 2018
Bridge Details
- Structure #
- 750925
- Year Built
- 2018
- Length
- 50.5 m (165.7 ft)
- Max Span
- 50.5 m
- Width
- 18 m (59.1 ft)
- Lanes
- 3
- Daily Traffic
- 3,400
- Material
- Steel
- Design
- Box Beam or Girders - Single or Spread
- Owner
- State Toll Authority
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.