I-4 EB EL over US-441

1.3MI E/O JOHN YOUNG PKWY · County 095, Florida · Built 2020 · 2 Lanes · 12,750 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
750909
Year Built
2020
Length
82 m (269 ft)
Max Span
43.6 m
Width
13.4 m (44 ft)
Lanes
2
Daily Traffic
12,750
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.