SR-429 NB over Morris Access Road
2.3 Mi. N of W Kelley Pk · County 095, Florida · Built 2017 · 2 Lanes · 5,200 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
28.775639, -81.544722
This bridge is in worse condition than 8.7% of bridges in County 095. The average bridge in Florida is 0 years old; this one is 9 years old.
Nearby Bridges
SR-429 SB over Morris Access Road
Built 2017
SR-429 NB over Pond 2
Built 2017
SR-429 SB over Pond 2
Built 2017
SR-429 SB over FGT Easement
Built 2018
SR-429 NB over FGT Easement
Built 2017
SR-429 SB over Plymouth Sorrento Road
Built 2018
SR-429 SB over Plymouth Sorrento Road
Built 2018
SR-429 NB over Plymouth Sorrento Road
Built 2018
SR-453 SB over Plymouth Sorrento Road
Built 2018
SR-429 SB over CR-435 Mt. Plymouth Rd.
Built 2017
Bridge Details
- Structure #
- 750872
- Year Built
- 2017
- Length
- 28.1 m (92.2 ft)
- Max Span
- 28.1 m
- Width
- 13.1 m (43 ft)
- Lanes
- 2
- Daily Traffic
- 5,200
- Material
- Prestressed Concrete
- Design
- Box Beam or Girders - Single or Spread
- Owner
- State Toll Authority
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.