Turnpike Ramp D1 over I-4

0.3mi E of I-4 Exit · County 095, Florida · Built 2018 · 3 Lanes · 43,700 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
750592
Year Built
2018
Length
88.8 m (291.3 ft)
Max Span
45 m
Width
23.5 m (77.1 ft)
Lanes
3
Daily Traffic
43,700
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.