I-4 WB Off-Ramp over South St & Ramp G
I-4 (SR-400) WB Off-ramp · County 095, Florida · Built 2007 · 2 Lanes · 18,000 vehicles/day
Overall
Deck
8
Very Good
Superstructure
7
Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 7 | Good |
| Substructure | 8 | Very Good |
Location
28.538222, -81.383028
This bridge is in worse condition than 26.5% of bridges in County 095. The average bridge in Florida is 0 years old; this one is 19 years old.
Nearby Bridges
I-4 WB over South Street
Built 2020
I-4 WB EL over South Street
Built 2020
I-4 EB over South Street
Built 2017
I-4 WB to EB SR408 over I-4/408
Built 2019
I-4 WB over ANDERSON ST RAMP B
Built 2021
I-4 EB On-ramp over I-4 EB Off-ramp (Ramp E)
Built 2008
I-4 WB EL over Church Street
Built 2021
Anderson Street over I-4 & CFRC RR
Built 2008
I-4 WB TO WB 408 over I-4
Built 2019
I-4 WB EL over Church Street
Built 2021
Bridge Details
- Structure #
- 750574
- Year Built
- 2007
- Length
- 116.4 m (381.9 ft)
- Max Span
- 57.9 m
- Width
- 13.1 m (43 ft)
- Lanes
- 2
- Daily Traffic
- 18,000
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.