SR-408WB to I-4EB over Anderson St
0.1 Mi East of I-4 · County 095, Florida · Built 2008 · 1 Lanes · 13,000 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 8 | Very Good |
Location
28.536347, -81.380717
This bridge is in worse condition than 26.5% of bridges in County 095. The average bridge in Florida is 0 years old; this one is 18 years old.
Nearby Bridges
Entrance CNL park over CNL Parking Garage
Built 2009
I-4 EB On-ramp over I-4 EB Off-ramp (Ramp E)
Built 2008
408 EB RAMP A2 over ORANGE AVE
Built 2020
SR 408 WB On Ramp over Sylvia Lane
Built 2019
I-4 WB over ANDERSON ST RAMP B
Built 2021
Anderson Street over I-4 & CFRC RR
Built 2008
SR-408 over SR-408
Built 1973
SR-408WB to I-4EB over I-4 Ramp-D
Built 2008
I-4 EB over South Street
Built 2017
SR-408 over Orange Ave (SR-527)
Built 1973
Bridge Details
- Structure #
- 750571
- Year Built
- 2008
- Length
- 441 m (1446.9 ft)
- Max Span
- 70.1 m
- Width
- 11.2 m (36.7 ft)
- Lanes
- 1
- Daily Traffic
- 13,000
- Material
- Steel Continuous
- Design
- Box Beam or Girders - Multiple
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.