SR-429 SB over CR-535

3 Mi. South of Turnpike · County 095, Florida · Built 2005 · 2 Lanes · 29,750 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
750537
Year Built
2005
Reconstructed
2023
Length
50.2 m (164.7 ft)
Max Span
49.6 m
Width
20.6 m (67.6 ft)
Lanes
2
Daily Traffic
29,750
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Toll Authority
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.