I-4 WB over SR-423
I-4 WB at SR-423 · County 095, Florida · Built 2006 · 5 Lanes · 91,500 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
28.508853, -81.418761
This bridge is in worse condition than 26.5% of bridges in County 095. The average bridge in Florida is 0 years old; this one is 20 years old.
Nearby Bridges
I-4 WB Exp Lanes over SR-423
Built 2021
I-4 EB Exp over John Young Pkwy
Built 2018
I-4 EB over SR-423
Built 2006
I-4 WB over SR-423
Built 2006
Gulfstream Rd. over Catalina Canal
Built 1958
Catalina Drive over Catalina Canal
Built 1958
John Young Parkway over Clear Lake
Built 1995
I-4 EB EL over Rio Grande Ave
Built 2020
I-4 WB over Rio Grande Avenue
Built 2020
I-4 EB over Rio Grande Avenue
Built 2018
Bridge Details
- Structure #
- 750513
- Year Built
- 2006
- Reconstructed
- 2018
- Length
- 61 m (200.1 ft)
- Max Span
- 61 m
- Width
- 29.3 m (96.1 ft)
- Lanes
- 5
- Daily Traffic
- 91,500
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.