SR 528 EB 4.3 over SR 91 TPK 255.8

4.3 MI E OF SR 400 I-4 · County 095, Florida · Built 1973 · 4 Lanes · 41,900 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
750219
Year Built
1973
Reconstructed
2019
Length
108.2 m (355 ft)
Max Span
24 m
Width
21.7 m (71.2 ft)
Lanes
4
Daily Traffic
41,900
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Toll Authority
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.