I-4 WB over Central Fl Pkwy

I-4 WB - Central Fl Pkwy · County 095, Florida · Built 1960 · 4 Lanes · 94,500 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
750142
Year Built
1960
Reconstructed
1979
Length
27.1 m (88.9 ft)
Max Span
26.5 m
Width
21.6 m (70.9 ft)
Lanes
4
Daily Traffic
94,500
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$20,000
Total Project Cost
$66,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.