SR 528 WB 3.1 over CR 423 JOHN YOUNG PKWY

3.1 MI EAST OF SR 400 I-4 · County 095, Florida · Built 1973 · 4 Lanes · 50,800 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
750091
Year Built
1973
Reconstructed
2019
Length
88.4 m (290 ft)
Max Span
26.9 m
Width
23.5 m (77.1 ft)
Lanes
4
Daily Traffic
50,800
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Toll Authority
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.