US-301 (SR-200) NB over BRANCH OF THOMAS CREEK

US-301/ BR. THOMAS CREEK · County 089, Florida · Built 2015 · 2 Lanes · 4,150 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
740118
Year Built
2015
Length
36.6 m (120.1 ft)
Max Span
9.3 m
Width
13.1 m (43 ft)
Lanes
2
Daily Traffic
4,150
Material
Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.