US-1 SB (SR-15) over ST. MARYS RIVER

FL. - GA. LINE · County 089, Florida · Built 1957 · 2 Lanes · 5,006 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
740018
Year Built
1957
Length
116.4 m (381.9 ft)
Max Span
23.5 m
Width
10.4 m (34.1 ft)
Lanes
2
Daily Traffic
5,006
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$409,000
Total Project Cost
$409,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.