Secretary Trail over Seminole Waterway

0.1Mi SW of Selma Trail · County 035, Florida · Built 1970 · 2 Lanes · 500 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
735503
Year Built
1970
Length
12.2 m (40 ft)
Max Span
12.2 m
Width
10.7 m (35.1 ft)
Lanes
2
Daily Traffic
500
Material
Prestressed Concrete
Design
Slab
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.